TB 11-6625-2713-50
CHANGE 1
DEPARTMENT OF THE ARMY TECHNICAL BULLETIN
Headquarters, Department of the Army, Washington, DC
17 June 1980
TB 11-6625-2713-50, 29 December 1978, is changed as follows:
Page 4, paragraph 7a(6), line 1. "CH 1" is changed to read: CH 2.
Paragraph 8a(6), line 2. "CH 1" is changed to read: CH 2.
Paragraph 8a(8), line 1. "CH 1" is changed to read: CH 2.
Paragraph 9a(2), line 2. "CH 1" is changed to read: CH 2
Paragraph 9a(3), line 1. "CH 1" is changed to read: CH 2.
Page 5, paragraph 9a(5) and (6) are superseded as follows:
(5) Set TI VERTICAL MODE to CH 2.
(6) Repeat steps (*3) and (4) above for channel 2.
(7) Connect digital voltmeter (A3) to junction of A2A3R9 and A2A3R20 (fig. 2) and
chassis ground. If digital voltmeter does not indicate zero voltage 50 mV, perform b(1)
below.
(8) Set TI VERTICAL MODE to CH 1. If digital voltmeter does not indicate zero
voltage 50 mV, perform b(2) below.
(9) Set TI VERTICAL MODE to CH 1.
PIN: 015255-001