7. Equipment Setup
WARNING
HIGH VOLTAGE is used or exposed during the performance of
DEATH ON CONTACT may result if
personnel fail to observe safety precautions.
a. Place TI near a 120 V-60 Hz power outlet.
b. Release the Dzus fasteners which retain the top cover and control drawer.
c. Raise the top cover and fasten it securely in place with the knurled fasteners.
d. Open control drawer until latches, which retain drawer at half-open position,
engage.
e.
Remove hold-down brackets and
level TI,
using leveling screws located at
each
bottom corner of TI.
f. Check hydraulic fluid level and fill, as required, by releasing the Dzus fasteners at
the front edge of the work area and raising the perforated work-surface plate.
NOTE
Use MIL-H-5606 hydraulic fluid only. Capacity is
approximately 9 quarts. The fluid level should be to the fluid
level plates.
g. Open needle valves VI, V2, V3, V4 and V6.
h. Remove drawer by disconnecting cable
a. Performance Check
(1) Remove wires from M1 and as shown in figure 1.
Figure 1. Voltage setup.