TB 9-6625-2341-24
(62) Remove/disconnect both banana wires from calibrator OUTPUT HI and LO from
TI, while leaving BNC circuit connected.
(63) Voltage ramp and 1:1 probe for INPUT A by pressing pushbuttons sequence (a)
through (d) below:
(a) Voltage ramp by toggling
to display/highlight (
CAL 17).
or
or
(b) Press (F5) READY, then wait till display/highlight READY is not highlighted.
(c) 1:1 probe for INPUT A by toggling
to display/highlight (
CAL 21).
or
or
(d) Press (F5) READY, then wait till display/highlight READY is not highlighted.
(64)
Displayed "Calibration has been completed successfully", then press (F1) CLOSE.
(65)
Disconnect BNC cable from INPUT A and reconnect it to INPUT B.
(66)
Select 1:1 probe for INPUT B by toggling
to display/highlight (
CAL 22).
or
or
(67)
Press (F5) READY, then wait till display/highlight READY is not highlighted.
(68)
Displayed "Calibration has been completed successfully", then press (F1) CLOSE.
(69)
Connect equipment as shown in figure 14 below:
(70) Select 10:1 red probe for INPUT A by toggling
to display/highlight (
CAL 19).
or
or
(71) Press (F5) READY, then wait till display/highlight READY is not highlighted.
(72)
Displayed "Calibration has been completed successfully", then press (F1) CLOSE.
(73)
Disconnect PM8918 10:1 red probe from INPUT A.
39