TB 9-6685-363-50
NOTE
Unless otherwise specified, verify the results of each test and whenever the test
requirement is not met, take corrective action before continuing with the
Adjustments required to calibrate the TI are included in this
procedure. Additional maintenance information is contained in the manufacturer's
manual for this TI.
8. Initial Procedure.
a. Performance Check.
(1) Assure equipment is
set up in
accordance with paragraph 7.
(2) Connect force calibrator (A2) and load cell (A1) to operate in tension.
2
(3) Set approximately 750 pounds/square inch (psi) (52.50 kilograms/centimeters squared (kg/cm )) on TI
9