TB 55-4920-431-35
Section III
PRELIMINARY OPERATIONS
7.
Preliminary
Instructions.
a. The instructions outlined in this section are preparatory to the calibration
process. Personnel should become familiar with the applicable sections before
beginning the calibration.
b . Items of equipment used in this procedure are referenced within the text by
common name and item identification number as listed in tables 2, 3, and 4. For
the identification of equipment referenced by item numbers prefixed with A (See
HIGH VOLTAGE is used or exposed during the
CONTACT may result if personnel fail to
observe safety precautions.
Unless otherwise specified, all controls and
control settings refer to the TI.
Equipment Setup.
8.
Set all switches on TI to down position.
a.
b.
Check both TI meters for mechanical zero and adjust if necessary.
c.
Connect test equipment as shown in figure 1 connection A.
d. Adjust DC power supply (A4) for 28 vdc + 0.5 vdc as indicated on digital
--
Test equipment power will be switched off
before making or removing jumper and/or
test equipment connections.
5