• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Integrator Network Calibration

Calibration Procedure For Vibration Monitoring Kit Consolidated Electrodynamics Type 1-117 Page Navigation
  1    2    3    4  5
TB 9-4920-453-24
(3) Set OPERATION switch to each velocity and displacement position and note
meter indications.
(4) Meter will not indicate more than 1 division on 0 to 5 scale (2 percent of full scale).
b. Adjustments. No adjustments can be made.
11. Final Procedure
a. Deenergize and disconnect all equipment and reinstall protective cover on TI.
b. Annotate and affix DA label/form in accordance with TB 750-25.
6


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.