TB 9-6625-1873-40
Figure 2. Insertion loss connection.
(6) Refer to figure 2 for insertion of the TI. The Loss must be less than 0.5 dB for
TP 75 or 0.8 for TP93.
(7) Follow the on-screen instructions until the test is completed.
(8) When the test is finished the data will be displayed on a spreadsheet. Copy the
data and save it to a file to keep it as a record for the TI.
(9) Verify that the TI is within the manufacturer's specifications listed in table 1. If
the TI fails, then reject the TI and tag it as defective.
b. Adjustments. No adjustments can be made.
a. Deenergize and disconnect all equipment.
b. Annotate and affix DA label/form in accordance with TB 750-25.