• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Delayed and Undelayed

Calibration Procedure For Signal Generator, An/Urm-206 And Model 1608E-Y Page Navigation
  5    6    7    8    9  10
img
. . . . . . . . .
TB 9-6625-2000-35
Figure 3. Signal generator - left view.
(4) Connect multimeter between chassis ground and pin 3 of connector A3J5 (fig. 1),
using high-voltage probe.  If multimeter does not indicate between -1831.5 and -1868.5,
perform b (3) below.
(5) Set F control to 0 position.
(6) Connect multimeter between pin 2 and pin 3 (common) of A3J3 (fig. 1).
If
multimeter does not indicate between 6.237 and 6.363, perform b (4) below.
b. Adjustments
(1) Adjust A5R5 (fig. 1) until multimeter indicates 2.30 V dc (R).
(2) Adjust 1A4R21 (fig. 3) until multimeter indicates -1250 V dc (R).
(3) Adjust A3R42 (fig. 1) until multimeter indicates -1850 V dc (R).
(4) Adjust A3R1 (fig. 1) until multimeter indicates 6.30 V dc (R).
15. Final Procedure
a. Deenergize and disconnect all equipment.
b. Annotate and affix DA label/form in accordance with TB 750-25.
11(12 Blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.