a. The TEMOD item fielding procedure is shown in figure 2-2. The numbered steps in this
figure show the normal flow of the old and new TMDE. At each step the equipment requires the
following documentation:
(1)
Step 1. The Transportation Control Movement Document (TCMD).
(2)
Step 2. DD Form 1348 -1 issue document.
(3)
Step 3. DD Form 1348 -1 turn-in document.
(4)
Step 4. Copy of turn-in document to Depot or DMRO.
b. TMDE identified for replacement may be retained at the Class VII SSA or the Central
Turn-in point for 45 days to assure that TEMOD items adequately fulfill mission requirements.
MFPs may also contain a second list of potentially replaced TMDE; during the 45-day period,
using units should further determine if on-hand instruments identified are replaceable by the
TEMOD item. If so, this would require the user to update authorization documents.
c. TEMOD MFPs provide disposition instructions for all replaced TMDE identified in the
BOIP. TEMOD replaced items must be turned in concurrent with the issue of the new TMDE,
unless temporarily retained IAW paragraph 2-5b. These instructions will direct that old TMDE be
turned in to DRMO or to the wholesale supply system. Items identified for disposal will not require
a technical inspection for turn-in.
d. Using units should inform Product Manager, Test, Measurement and Diagnostic
Equipment, ATTN: SFAE-CSS -CS -T-TEMOD, Redstone Arsenal, AL 35898 -5000 of TMDE that
cannot be replaced by the TEMOD item.