*TB 43-177
Figure 1. Flow chart for the US Amy Volt.
5.
Responsibilities
technical bulletin.
a. The U. S. Army Primary Standards Laboratory
will schedule, disseminate, and assign the values to the
6. Equipment and Accessories Required.
Table 1 lists minimum use specifications of
equipment
required for performance of calibration covered by this
technical bulletin. Table 2 lists required accessories.
b. The CRCs, using saturated standard cells, will
When any equipment listed in table 1 is not available,
obtain and transmit the data as required to implement
equivalent items may be substituted provided that they
meet the minimum use specifications.
3