TB 9-4931-491-35
(7) Set SWEEP TIME SEC to .1-.01.
(8) Adjust oscilloscope width to 10.4 cm (.2 cm overlap on each end) (fig. 10a).
(9) Connect oscilloscope to M2H TP2 (fig. 5) and chassis ground.
(10) If oscilloscope sweep does not "knee" (fig. 10b) approximately 2/3 cm to the left of
the 10 cm mark, perform b (3) below.
b. Adjustments
(1) Adjust R17 (fig. 5) for 0 V indication on oscilloscope (R).
(2) Adjust R26 (fig. 5) for 28 V pp indication on oscilloscope (R).
(3) Adjust R31 (fig. 5) until oscilloscope sweep "knees" approximately 2/3 cm to the
left of the 10 cm mark (R).
a. Deenergize and disconnect all equipment.
b. Annotate and affix DA label/form in accordance with TB 750-25.
17/(18 BLANK)