TB 9-4935-558-40
(9) Install the loading ball in the slider, the gage and the shims into the TI frame.
Insure that the loading ball is seated in socket of gauge assembly. Install socket head cap
screw and torque to 105 inch/pounds.
(10) Repeat the performance checks of 8 a (1) through (5) above.
a. Deenergize and disconnect all equipment.
b. Annotate and affix DA label/form in accordance with TB 750-25.