TB 9-6625-2280-35
(9) Adjust autotransformer controls from 105 to 125 V ac while observing
multimeter indications. Multimeter indications will be within the limits listed in the
change in voltage (mV) column of table 5.
(10) Repeat (8) and (9) above for remaining power supply voltages (V dc) listed in
(11) Press TI POWER switch to OFF position.
(12) Disconnect TI from equipment setup.
(13) Replace TI top.
b. Adjustments. No further adjustments can be made.
Figure 4. Power supply -
component locations.
Power supply
Test instrument test
Change in
Adjustments
voltages
voltage
(V dc)
LO
HI
Min
Max
(+mV dc)
+5
A2TP11
A2TP9
+4.9
+5.1
5
A2R42
-5.2
A2TP1
A2TP10
-5.0
-5.4
5.2
---
-15
A2TP6
A2TP5
-14.985
-15.015
15
A2R22
+15
A2TP6
A2TP3
+14.955
+15.045
15
---
a. Deenergize and disconnect all equipment.
b. Annotate and affix DA Label/Form in accordance with TB 750-25.
18