TB 9-6625-2365-35
b. Press and hold Enter key and press Stby On key to On (LED lit) and observe self-
check routine as discussed below.
(1) Upon power application, TI will perform a self-check and will display the
following screen.
(2) If self-check is successfully completed, the following screen will be displayed for
approximately one second and then the measurement screen will appear.
(3) If any of the self-checks fail, the results of the checks failing will be displayed in
the following screen. Take corrective action before proceeding.
(4) If the only self-check failure is in the GPIB-C area, the following screen will be
displayed. Continuation of operation is possible by pressing TI Preset key; however, the
GPIB port is disabled.
c. Allow TI to warm-up 24 hours (48 hours for option 003) before proceeding to
5