• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 20. Pulse Power Test

Calibration Procedure For Signal Generator Sg-1366/U Model N5183M Page Navigation
  14    15    16    17    18  19
img
. . .
TB 9-6625-103-24
(17) Reduce outputs to minimum.
(18) Disconnect equipment setup.
b. Adjustments. Refer to paragraph 6 c.
16. Final Procedure
a. Deenergize and disconnect all equipment.
b. Annotate and affix DA label/form in accordance with TB 750-25 if calibration was
limited to 26 GHz due to standards limitation annotate the DA Form 163 as such.
20


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.