TB 9-6625-2097-35
Figure 3. Model 13-4618-10 - right side view.
f. Energize equipment and allow 15 minutes for warmup and stabilization.
14. Converter Output
a. Performance Check
(1) Connect dc voltage standard (A3) to pins 1 and 2 of J-101, input connector on
rear of TI, using two leads (B5).
(2) Set CHART SPEED to 5, VARIABLE SPEED control fully ccw, and adjust CH.
1 POSITION control for pen deflection to right zero line on chart paper.
(3) Set dc voltage standard for a pen deflection of 50 mm on recorder (A6). If dc
voltage standard does not indicate between 0.999 and 1.001 V dc, perform b below.
10