TB 9-6625-2197-50
(8) Connect equipment as shown in figure 8, CONNECTION B, except reverse SUM
and DIFF connections (50 Ω load to SUM and power sensor to DIFF).
NOTE
Only one pulse will be transmitted out of the DIFF connector
when TI LAMP TEST pushbutton is pressed. Set peak power
meter cursor delay to approximately 400 ns, delay window to
approximately 1.0000 s, and set reference power to
approximately -4 dBm.
(9) Press TI LAMP TEST pushbutton.
(10) Measure peak power from the DIFF connector. Peak power meter reading will
be between 0 and - 4 dBm.
b. Adjustments. No adjustments can be made.
10. Transmitter Frequency Accuracy
a. Performance Check
Figure 10. Transmitter frequency accuracy -
equipment setup.