TB 9-6625-2326-35
NOTE
During Self Test, test lead connector must be disconnected
from TI.
k. Click on the Self Test button. Upon successful completion of Self Test, reconnect
a. Performance Check
(1) Connect TI red (+), black (-), and green (ground) connections to calibrator
OUTPUT terminals.
(2) Click on Performance Check button and follow on-screen instructions.
b. Adjustments
The test and calibration utility will give pass/fail indications. If there is an out-of-
tolerance finding on any function/range of the Performance Check, you will be given an
opportunity to repeat the test. If the out-of-tolerance finding still exists, you will be
prompted to run the Alignment Check. Follow on-screen instructions. When the Alignment
Check is successfully completed, you must rerun the Performance Check for a successful
completion of same.
a. Deenergize and disconnect all equipment.
b. Annotate and affix DA label/form in accordance with TB 750-25.