TB 9-6625-2343-50
a. Performance Check
NOTE
The TEGAM IIA measuring system must be warmed up for at
least 2 hours and connected in standard configuration prior to
taking measurements.
(2) Press multimeter keys as listed in (a) through (e) below:
(a)
Blue shift, RESET.
(b)
DCV.
(c)
Blue shift, AUTO.
(d)
Blue shift, N, 8, ENTER.
(e)
N RDGS/TRIG, 1, ENTER.
(3) Press TI keys as listed in (a) and (b) below:
(a) DATA 45.0.
(b) DATA SPCL.
(4) Record indication displayed on multimeter as V off.
(5) Press TI keys as listed in (a) and (b) below:
(a) DATA 45.16.
(b) DATA SPCL.
(6) Record indication displayed on multimeter as V on.
(7) Record thermistor mount correction factor for 50 MHz as C.