• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 2. Minimum Specifications of Equipment Required - Continued
Figure 1. Channel isolation - test equipment setup.

Calibration Rrocedure For Vector Voltmeter, Me-512/U And Models 8405A And 8405A-H16 Page Navigation
  1    2    3  4  5    6    7    8    9  
img
. . . . . . . . .
TB 9-6625-2213-24
SECTION III
CALIBRATION PROCESS
6. Preliminary Instructions
a. The instructions outlined in paragraphs 6 and 7 are preparatory to the calibration
process. Personnel should become familiar with the entire bulletin before beginning the
calibration.
b. Items of equipment used in this procedure are referenced within the text by common
name as listed in table 2.
c. Unless otherwise specified, verify the result of each test and, whenever the test
requirement is not met, take corrective action before continuing with the calibration.
Adjustments required to calibrate the TI are included in the procedure. Additional
maintenance information is contained in the manufacturers' manuals for this TI.
d. Unless otherwise specified all controls and control settings refer to the TI.
7. Equipment Setup
WARNING
HIGH VOLTAGE is used or exposed during the performance of
this calibration.
DEATH ON CONTACT may result if
personnel fail to observe safety precautions.
REDUCE
OUTPUT(S)  to  minimum  after  each  step  within  the
performance check where applicable.
NOTE
Ensure proper calibration factors for sensor module being used
are loaded into measuring receiver
a. Mechanically zero TI meters.
b. Press LINE PUSH ON/OFF pushbutton to ON and allow TI to warm-up for 1 hour.
8. Channel Isolation
a. Performance Check
(1) Connect equipment as shown in figure 1.
5


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.