• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table 22. Meter Volt Gain

Calibration Procedure For Scopemeter Models 190-202 And 190-202/Ar Page Navigation
  19    20    21    22    23  24
img
. . .
TB 9-6625-134-24
j.
Calibration Data Save/Exit
(1) Press F4 EXIT.
(2) Press F4 YES to save and exit.
k. Repeat performance checks from paragraphs 8 through 17.
19. Final Procedure
a. Deenergize and disconnect all equipment.
b. Annotate and affix DA label/form in accordance with TB 750-25.
26


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.