• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Performance Check
Figure 22. Vo123 Connection.

Calibration Procedure For Engine Torquemeter Test Set (Etts) Pn 09-1009-02 Page Navigation
  10    11    12    13    14  15  16    17    18    19    20  
img
. .
TB 9-4920-467-24
Figure 21. Vx Connection.
b.
Adjustments
(1)  Select and activate Align on the UxValidator.
On-screen instructions are
displayed.
(2)
Connect equipment as shown in figure 21.
(3)  Connect multimeter between TI ETTS Pod pin C (+) and pin Y (-) to measure
voltage difference between calibrators 1 and 2.
(4)
Set calibrator 1 to output 17.000 V dc and set calibrator 2 to output 16.900 V dc.
16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.